Bixley B1332 Bungay Road Surfacing

Works are programmed to begin on or soon after Monday 2nd July 2018 to resurface a section of the carriageway on the B1332 Bungay Rd. The works will extend 2176m south of a point 60m south from the A146 Loddon Road / B1332 Bungay Road junction. The works are expected to take 20 evenings to complete, weather permitting.

During the resurfacing operations it will be necessary to close the road to all through traffic (07.00pm to 06.00 am Monday to Friday) and during this period a signed diversion will be in place. These measures are essential to safely carry out the necessary maintenance works to the highway.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s